Choosing and Using the ToolsLesson 34 of 76

Module 4 · What it actually costs

Spending money where it matters

In this lesson

  • 8 min read
  • 7 reading sections
  • Knowledge check
  • Lesson 6 of 10 in this chapter

This chapter’s goalEstimate the cost of a job from a measured sample before running it, cut that cost with prefix caching, batching and model routing without lowering quality, choose between a subscription, prepaid credit and pay-as-you-go for your own pattern of use, and set an enforced cap so the worst case is bounded.

This chapter’s media

The film explains chapter ideas. The audiobook narrates the complete teaching text.

FormatEnglishहिंदी
Chapter filmNot availableNot available
Full audiobookNot availableNot available
A hundred items, run through both modelsLarge model rightLarge model wrongSmall model right71the cascade is safe here9small right, large wrongSmall model wrong14escalation has to catch these6the prompt or the task, not the modelThe fourteen in the lower left are what you are paying the large model for, and your escalation ruleshave to catch them. The nine in the top right are the group people forget: large models are better onaverage rather than uniformly, and they overthink simple cases.
The fourteen in the lower left are what you are paying the large model for, and your escalation rules have to catch them. The nine in the top right are the group people forget: large models are better on average rather than uniformly, and they overthink simple cases.

Figure

A little at a time

Explore an idea, try it, then check what stays.

Step 1 of 8Free · no account needed
Lesson steps

The shape production systems actually have

People assume the systems they admire run the best available model on every request. Very few do. The common design is a cascade: a cheap model handles everything, and only the cases it cannot settle go to an expensive one.

Text
1,000 items
  -> small model handles all 1,000            $0.40
  -> 120 flagged uncertain go to large model  $2.60
                                              -----
                                              $3.00
  versus all 1,000 on the large model:       $21.60

Eighty-six per cent saved, with the hard cases still getting the expensive treatment. This is not a compromise design. On many tasks it also scores better than the large model alone, because the escalation step forces a second look at exactly the items most likely to be wrong.

Your place and first choices stay on this browser. Classroom credit is recorded separately.

Every lesson here is open. Your progress is recorded once you pass the AI at Work exam.

Stuck on something?Ask Rukmini, your AI tutor

How to cite: Addaly (2026) ‘Spending money where it matters’, in Choosing and Using the Tools. Edited by M. Mun. Addaly. Available at: https://addaly.com/learn/choosing-your-tools/routing-by-difficulty (Accessed: 29 November 2026).